Storage Room Workbench & Coat Rack

Finally I had the opportunity to roll up my sleeves and build something for the house. Work and life have been beyond crazy, but I was able to carve out a Saturday and Sunday to work on a couple storage and workspace solutions for the basement storage room.

The first unit is a workbench for the wife. She’s a paper artist and sometimes needs to spray glue large pieces of card stock so there is a spray booth in the middle of the workbench. No more spraying on the floor. To the right is a baker’s rack style set of shelves. And to the left of the booth is a small work bench with pegboard backdrop. I purposefully left space to the left of the unit to access existing storage shelves, and possibly tuck away loose and bulky storage room items.

The other unit I made is a coat rack. In winter we have a ton of boots and coats, but once summer comes we have no place to put them. This two level unit will hold a ton of winter gear. There is also a shelf and under shelf space for winter boots and unused shoes.

It was a very satisfying project to work on. It’s my therapy, meditation or whatever you want to call it. Challenging enough that it takes some planning, but mindless enough to be satisfying. And no one tells me what to do. I can do it my way. Which anyone who’d reached middle age can tell you, is a rewarding situation.

The storage room looks great now. We’re more organized and have some useful work space. We also took the opportunity to move the cat’s litter boxes to an open area in the room instead of in front of the storage room door. It’s all a wonderful monkey to get off of my back, and allows us to focus on the fun, “living” part of life instead of the “ugh, we still need to do that” part of life.

Overall cost was about $117 for lumber, and $40 for screws and misc hardware. It took me about four to six hours to cut, assemble and install everything. The 2×4’s are definitely overkill – but trees grow back, and it’s easy to find lumber in this size at a reasonable price. Plus it’s straight; 2×3’s or 2×2’s tend to be crooked. The units are screwed into the ceiling above when possible. The Superior Walls are difficult if not impossible to fasten into. At the bottom I placed plastic shims to level everything and I will add metal brackets to tie the units into the cement floor so they don’t fall over.

Eventually we will add lighting to the storage room. I’m thinking three overhead linear LED work lights, and then maybe task light bars over the bench work spaces.

Let me know what you think, and what you’re working on, in the comments section. Here are some pics, ask questions in the comments too…

-Chris